Traffic pattern change coming to Novum Road intersection in Madison County
CULPEPER – Beginning Friday, Aug. 28, Virginia Department of Transportation crews will modify the traffic pattern at the intersection of Route 606 (Novum Road) and Route 605 (Parish Road/Novum Church Road) in Madison County. The work will include installing new signs at the intersection. Weather permitting, the work is expected to be completed the same day.
The existing two-way stop will be converted to an all-way stop with new stop signs installed on Route 606. “Stop Ahead” warning signs will also be installed on all approaches to alert drivers to the permanent traffic pattern change.
During the work, drivers should expect brief delays and intermittent flagging operations. Drivers should use caution when traveling near the work zone and remain alert to the new traffic pattern.
Local updates about conditions in VDOT’s Culpeper District are posted to X.com/VaDOTCulp and the Culpeper District Facebook page.
Current traffic conditions, VDOT’s statewide network of traffic cameras, and other travel information are available on the 511 Virginia website, the free VDOT 511 mobile app, or by calling 511 from any phone in Virginia.
VDOT’s Culpeper District includes the counties of Albemarle, Culpeper, Fauquier, Fluvanna, Greene, Louisa, Madison, Orange and Rappahannock. The independent city of Charlottesville maintains its own roads.
Legal Disclaimer:
EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.