AGP Picks
View all

72-hour single-lane closure scheduled on East Little Creek Road in Norfolk

NORFOLK — Contractor crews with the Virginia Department of Transportation (VDOT) are scheduled to implement a continuous single-lane closure for approximately 72 hours on East Little Creek Road for roadway paving and concrete work, as part of construction for the Hampton Roads Express Lanes (HREL) Norfolk Segment.

Starting as early as 8 p.m. Aug. 17, the contractor will close the westbound left lane on East Little Creek Road between West Glen Road and East Admiral Taussig Boulevard at the I-64 overpass. All traffic will be shifted to the right lane, resulting in a single lane of travel on this portion of East Little Creek Road. The lane closure is estimated to be in place until approximately 8 p.m. Aug. 20.

Motorists are reminded to use caution when traveling near work zones, obey posted speed limits, follow lane markings and barrier guides, be alert to digital message signs, and drive distraction-free. 

All work is weather- and schedule-dependent; therefore, this schedule is subject to change.

Before hitting the road, consider using VDOT's free 511 Virginia traffic tools, or the free 511-integrated Waze GPS app, to check for the most up-to-date road and travel conditions. VDOT’s 511Virginia website and mobile app offer information about construction, traffic, incidents, and congestion, as well as access to traffic cameras, weather-related impacts, and more. 

Hampton Roads Express Lanes (HREL) Norfolk Segment (Phase 1A) Project

This work is part of the first phase of HREL Norfolk Segment construction projects which started in summer 2023 and includes the conversion of the existing inside shoulder along I-64 into a high-occupancy tolled, part-time shoulder Express Lane running alongside the three existing general-purpose lanes between Patrol Road and Tidewater Drive for a total of 2 miles, as well as the widening and rehabilitation of several existing bridges on I-64.

This HREL Norfolk Segment will ultimately become a part of an overall continuous 45-mile high-occupancy toll Express Lanes network on I-64, from west of Denbigh Boulevard in Newport News to the I-264/I-664 Bowers Hill interchange in Chesapeake. As traffic demand continues to increase in the region, incorporating the Express Lanes dynamic tolling model, together with other interstate improvements, provides an additional approach to managing congestion in the long term and providing more travel choices and a reliable travel network for Hampton Roads motorists. For more information on the Hampton Roads Express Lanes projects and to learn more about construction updates, traffic impacts, and to sign up to receive project updates, visit the HREL website (64expresslanes.org).

The HREL website features an interactive map to help motorists stay informed about long-term traffic impacts across all HREL projects. The map displays current long-term lane and ramp closures along the HREL corridor, offering a user-friendly way to view potential travel impacts and focus on locations most relevant to each trip. Whether planning a daily commute or keeping up with project progress, the map can help motorists navigate I-64 with greater awareness. To explore the map, visit VDOT’s Long-Term Traffic Impacts page.

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Share this page:

Advanced Search Options

Search for:

Search scope:

Type:

Search in:

Date range:

The last

Sort by:

Sign up for:

The Curious Traveler Virginia

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.